2023 BMW M4 Competition AWD

Delavan, Wisconsin
  • Año

    2023

  • Millaje

    21899 mi

  • Combustible

    Gasoline

  • Transmisión

    8-Speed Automatic Steptronic

SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
  • MPG CIUDAD

    16

  • MPG CARRETERA

    22

  • Color Exterior

    Green

  • Color Interior

    Kyalami Orange/Black

  • Número de Stock

    01K350

  • VIN

    WBS43AZ06PCM46883

Contactar al concesionario
*Required Fields
Nuestro robot de inteligencia artificial puede seleccionar hasta 5 autos similares para ti y obtener cotizaciones.
  • ** BACKUP CAMERA
  • ** BLUETOOTH
  • ** HEATED SEATS
  • ** LEATHER
  • ** NAVIGATION
  • 16 Speakers
  • 4-Wheel Disc Brakes
  • ABS brakes
  • AM/FM radio: SiriusXM
  • Adaptive suspension
  • Air Conditioning
  • Alloy wheels
  • Apple CarPlay & Android Auto Compatibility
  • Auto High-beam Headlights
  • Auto-dimming Rear-View mirror
  • Auto-dimming door mirrors
  • Automatic temperature control
  • BMW Assist eCall
  • BMW TeleServices
  • Brake assist
  • Bumpers: body-color
  • Carbon Fiber Trim
  • Compass
  • ConnectedDrive Services
  • Delay-off headlights
  • Drive Recorder
  • Driver door bin
  • Driver vanity mirror
  • Dual front impact airbags
  • Dual front side impact airbags
  • Electronic Stability Control
  • Emergency communication system: BMW Assist eCall
  • Enhanced USB/Bluetooth Plus Smartphone Integration
  • Extended Merino Leather Upholstery
  • Exterior Parking Camera Rear
  • Four wheel independent suspension
  • Front Bucket Seats
  • Front Center Armrest
  • Front anti-roll bar
  • Front dual zone A/C
  • Front reading lights
  • Fully automatic headlights
  • Garage door transmitter
  • Heated Front Seats
  • Heated door mirrors
  • Heated front seats
  • Icon Adaptive LED Headlights w/Laserlight
  • Illuminated entry
  • Knee airbag
  • Leather Shift Knob
  • Live Cockpit Pro w/Navi
  • Low tire pressure warning
  • Lumbar Support
  • M Carbon Bucket Seats
  • M Compound Brakes w/Black Calipers
  • M Drive Professional
  • M Shadowline Lights
  • M Sport Seats
  • Memory seat
  • Navigation System
  • Occupant sensing airbag
  • Outside temperature display
  • Overhead airbag
  • Overhead console
  • Panic alarm
  • Parking Assistance Package
  • Parking Assistant Plus
  • Passenger door bin
  • Passenger vanity mirror
  • Power Front Seats
  • Power door mirrors
  • Power driver seat
  • Power passenger seat
  • Power steering
  • Power windows
  • Radio data system
  • Radio: AM/FM Audio System
  • Rain sensing wipers
  • Rear air conditioning
  • Rear anti-roll bar
  • Rear reading lights
  • Rear seat center armrest
  • Rear window defroster
  • Remote keyless entry
  • Security system
  • SiriusXM Satellite Radio
  • Speed control
  • Speed-Sensitive Wipers
  • Speed-sensing steering
  • Split folding rear seat
  • Spoiler
  • Sport steering wheel
  • Steering wheel mounted audio controls
  • Tachometer
  • Telescoping steering wheel
  • Tilt steering wheel
  • Traction control
  • Trip computer
  • Turn signal indicator mirrors
  • Variably intermittent wipers
  • Wheels: 19" x 9.5" Fr/20" x 10.5" Rr (Style 826M)
  • Wheels: 19" x 9.5" Fr/20" x 10.5" Rr Silver
  • harman/kardon Surround Sound System
  • harman/kardon® Speakers
  • Marca
  • BMW
  • Modelo
  • M4
  • Versión
  • Competition AWD
  • Tipo
  • Coupé
  • Año
  • 2023
  • Número de Stock
  • 01K350
  • Color Exterior
  • Green
  • Millaje
  • 21899 mi
  • Transmisión
  • 8-Speed Automatic Steptronic
  • Combustible
  • Gasoline
  • VIN
  • WBS43AZ06PCM46883
Comentarios del vehiculo

** LEATHER, ** HEATED SEATS, ** BACKUP CAMERA, ** NAVIGATION, ** BLUETOOTH.

Certified. Certification Program Details:

** NO FEAR LIFETIME CERTIFIED PREOWNED **
Over $2,895 of value at no cost!
*LIFETIME WARRANTY!
*3 Day Exchange Policy!
*Complimentary powertrain warranty with ability to upgrade to fully comprehensive coverage and/or extend up to 125,000 miles!
*125+ Point Inspection by our factory trained ASE Certified technicians and reconditioned to the highest standards.
*Complimentary AutoCheck History Report
*Complimentary AutoCheck Buyback Protection
*Financing for Everyone - Guaranteed credit approval regardless of credit history!
*Over 30 lenders who compete to get you the best financing terms
*No payments for up to 90 days!
*Weekly, Bi-Weekly, and Monthly Payment Options for all buyers!
*First Free Oil Change!
*Trade anytime policy - cars, trucks, boats, RVs, motorcycles - as long as we don’t have to feed it, you can trade it!


2023 BMW M4 Competition 3.0L I6 Turbocharged DOHC 24V LEV3-ULEV70 503hp 8-Speed Automatic Steptronic AWD Clean CARFAX. Odometer is 1137 miles below market average!

Find out why our dealerships have won DealerRater.com DEALER OF THE YEAR a whopping 10 TIMES! Call, email, or live chat with one of our friendly sales professionals now to schedule your test drive! Prices shown do not include tax, title, registration and $499 service fees.

Compra tu carro usado: 2023 BMW M4 Competition AWD por el precio de $90,849

Ven y compra este vehículo usado 2023 BMW M4 Competition AWD en el concesionario Kunes Ford of Delavan ubicado en 1234 Geneva St, Delavan Wisconsin 53115.

Este carro usado BMW se vende por $90,849.

Este modelo Coupé de color Green viene con 2 puertas y transmisión 8-Speed Automatic Steptronic.

Este seminuevo BMW, impulsado por Gasoline, fue registrado por primera vez en 2023 y tiene un kilometraje de 21,899 millas.

Características: Navigation System,Parking Assistance Package,16 Speakers,AM/FM radio: SiriusXM,harman/kardon Surround Sound System,harman/kardon® Speakers,Radio data system,Radio: AM/FM Audio System,SiriusXM Satellite Radio,Air Conditioning,Automatic temperature control,Front dual zone A/C,Rear air conditioning,Rear window defroster,Lumbar Support,Memory seat,Power driver seat,Power steering,Power windows,Remote keyless entry,Steering wheel mounted audio controls,Adaptive suspension,Four wheel independent suspension,Speed-sensing steering,Traction control,4-Wheel Disc Brakes,ABS brakes,Dual front impact airbags,Dual front side impact airbags,Emergency communication system: BMW Assist eCall,Front anti-roll bar,Knee airbag,Low tire pressure warning,M Compound Brakes w/Black Calipers,Occupant sensing airbag,Overhead airbag,Rear anti-roll bar,Brake assist,Electronic Stability Control,Exterior Parking Camera Rear,Auto High-beam Headlights,Delay-off headlights,Fully automatic headlights,Panic alarm,Security system,Speed control,Auto-dimming door mirrors,Bumpers: body-color,Heated door mirrors,Icon Adaptive LED Headlights w/Laserlight,M Shadowline Lights,Parking Assistant Plus,Power door mirrors,Spoiler,Turn signal indicator mirrors,Apple CarPlay & Android Auto Compatibility,Auto-dimming Rear-View mirror,BMW Assist eCall,BMW TeleServices,Carbon Fiber Trim,Compass,ConnectedDrive Services,Drive Recorder,Driver door bin,Driver vanity mirror,Enhanced USB/Bluetooth Plus Smartphone Integration,Front reading lights,Garage door transmitter,Illuminated entry,Leather Shift Knob,Live Cockpit Pro w/Navi,M Carbon Bucket Seats,M Drive Professional,Outside temperature display,Overhead console,Passenger vanity mirror,Rear reading lights,Rear seat center armrest,Sport steering wheel,Tachometer,Telescoping steering wheel,Tilt steering wheel,Trip computer,Extended Merino Leather Upholstery,Front Bucket Seats,Front Center Armrest,Heated Front Seats,Heated front seats,M Sport Seats,Power Front Seats,Power passenger seat,Split folding rear seat,Passenger door bin,Alloy wheels,Wheels: 19" x 9.5" Fr/20" x 10.5" Rr (Style 826M),Wheels: 19" x 9.5" Fr/20" x 10.5" Rr Silver,Rain sensing wipers,Speed-Sensitive Wipers,Variably intermittent wipers,** LEATHER,** HEATED SEATS,** BACKUP CAMERA,** NAVIGATION,** BLUETOOTH.

Descubre nuestros otros carros usados BMW M4 y todos nuestros vehículos nuevos en stock a los mejores precios en Delavan, Wisconsin, y las áreas circundantes de Wisconsin.



Buy your used car: 2023 BMW M4 Competition AWD for the price of $90,849.


Come and buy this used 2023 BMW M4 Competition AWD vehicle at Kunes Ford of Delavan dealership located at 1234 Geneva St, Delavan Wisconsin 53115.

This used BMW car is priced at $90,849.

This Coupé model in Green color comes with 2 doors and 8-Speed Automatic Steptronic transmission.

This BMW used car, powered by Gasoline, was first registered in 2023 and has a mileage of 21,899 miles.

Features: Navigation System,Parking Assistance Package,16 Speakers,AM/FM radio: SiriusXM,harman/kardon Surround Sound System,harman/kardon® Speakers,Radio data system,Radio: AM/FM Audio System,SiriusXM Satellite Radio,Air Conditioning,Automatic temperature control,Front dual zone A/C,Rear air conditioning,Rear window defroster,Lumbar Support,Memory seat,Power driver seat,Power steering,Power windows,Remote keyless entry,Steering wheel mounted audio controls,Adaptive suspension,Four wheel independent suspension,Speed-sensing steering,Traction control,4-Wheel Disc Brakes,ABS brakes,Dual front impact airbags,Dual front side impact airbags,Emergency communication system: BMW Assist eCall,Front anti-roll bar,Knee airbag,Low tire pressure warning,M Compound Brakes w/Black Calipers,Occupant sensing airbag,Overhead airbag,Rear anti-roll bar,Brake assist,Electronic Stability Control,Exterior Parking Camera Rear,Auto High-beam Headlights,Delay-off headlights,Fully automatic headlights,Panic alarm,Security system,Speed control,Auto-dimming door mirrors,Bumpers: body-color,Heated door mirrors,Icon Adaptive LED Headlights w/Laserlight,M Shadowline Lights,Parking Assistant Plus,Power door mirrors,Spoiler,Turn signal indicator mirrors,Apple CarPlay & Android Auto Compatibility,Auto-dimming Rear-View mirror,BMW Assist eCall,BMW TeleServices,Carbon Fiber Trim,Compass,ConnectedDrive Services,Drive Recorder,Driver door bin,Driver vanity mirror,Enhanced USB/Bluetooth Plus Smartphone Integration,Front reading lights,Garage door transmitter,Illuminated entry,Leather Shift Knob,Live Cockpit Pro w/Navi,M Carbon Bucket Seats,M Drive Professional,Outside temperature display,Overhead console,Passenger vanity mirror,Rear reading lights,Rear seat center armrest,Sport steering wheel,Tachometer,Telescoping steering wheel,Tilt steering wheel,Trip computer,Extended Merino Leather Upholstery,Front Bucket Seats,Front Center Armrest,Heated Front Seats,Heated front seats,M Sport Seats,Power Front Seats,Power passenger seat,Split folding rear seat,Passenger door bin,Alloy wheels,Wheels: 19" x 9.5" Fr/20" x 10.5" Rr (Style 826M),Wheels: 19" x 9.5" Fr/20" x 10.5" Rr Silver,Rain sensing wipers,Speed-Sensitive Wipers,Variably intermittent wipers,** LEATHER,** HEATED SEATS,** BACKUP CAMERA,** NAVIGATION,** BLUETOOTH.

Discover our other used BMW M4 cars and all our new vehicles in stock at the best prices in Delavan, Wisconsin, and the surrounding areas of Wisconsin.

Descargo de Responsabilidad:

autogozo es una plataforma que proporciona acceso a un inventario conjunto de varios concesionarios en todo Estados Unidos. Si bien nos esforzamos por garantizar la precisión de la información proporcionada en nuestro sitio web, no podemos garantizar la disponibilidad, los precios o el estado de ningún vehículo listado. autogozo actúa como intermediario y no es responsable de inexactitudes, omisiones o errores en los anuncios. Todas las transacciones se realizan directamente con los respectivos concesionarios, y autogozo no será responsable de disputas, representaciones incorrectas o problemas que puedan surgir durante el proceso de compra. Se recomienda verificar minuciosamente los detalles, llevar a cabo una debida diligencia y buscar asesoramiento profesional antes de realizar cualquier compra. Al utilizar nuestra plataforma, usted acepta que autogozo no es responsable de las condiciones de los vehículos, el cumplimiento legal ni de las transacciones realizadas a través de nuestro servicio.

2023 BMW M4 Competition AWD Green Gasoline