2023 BMW M4 Competition xDrive Convertible w/ Driving Assistance Pro. Pkg.

Wall, NJ
  • Año

    2023

  • Millaje

    14888 mi

  • Combustible

    Gasoline

  • Transmisión

    8-Speed Automatic

SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
  • Color Exterior

    Tanzanite Blue II Metallic

  • Color Interior

    Kyalami Orange/Black

  • Número de Stock

    63209K

  • VIN

    WBS33BA04PCL50117

Contactar al concesionario
*Required Fields
Nuestro robot de inteligencia artificial puede seleccionar hasta 5 autos similares para ti y obtener cotizaciones.
  • Premium Sound System
  • AM/FM
  • Bluetooth
  • Carpeted Floor Mats
  • Center Arm Rest
  • Clock
  • Cruise Control
  • Daytime Running Lights
  • Driver Airbag
  • Dual Zone Climate Control
  • Heads Up Display
  • Heated Mirrors
  • Intermittent Wipers
  • Leather Steering Wheel
  • Merino Leather Interior Surface
  • Overhead Console
  • Parking Sensors
  • Passenger Airbag
  • Power Mirrors
  • Power Steering
  • Rear Air Conditioning
  • Rear Defogger
  • Reverse Camera
  • Roll Stability Control
  • Security System
  • Side Airbags
  • Sliding Rear Window
  • Sport Seats
  • Steering Wheel Radio Controls
  • Tachometer
  • Telescoping Steering Wheel
  • Tire Pressure Monitor
  • Vanity Mirrors
  • Climate Control
  • Marca
  • BMW
  • Modelo
  • M4
  • Versión
  • Competition xDrive Convertible w/ Driving Assistance Pro. Pkg.
  • Tipo
  • Descapotable
  • Año
  • 2023
  • Número de Stock
  • 63209K
  • Color Exterior
  • Tanzanite Blue II Metallic
  • Millaje
  • 14888 mi
  • Transmisión
  • 8-Speed Automatic
  • Combustible
  • Gasoline
  • VIN
  • WBS33BA04PCL50117
Comentarios del vehiculo

EXHILARATING, PRECISE, LUXURIOUS, TRACK-READY, NO-ACCIDENT, NONSMOKER, ICONIC! This 2023 BMW M4 Competition xDrive Convertible delivers high-performance engineering with open-air luxury, combining BMW M engineering with advanced all-wheel-drive traction through the xDrive system. It reflects the brand's performance-driven philosophy while maintaining refined grand touring comfort and precision handling. The M4 Competition xDrive Convertible stands out in the performance luxury segment with its blend of coupe-level rigidity, convertible flexibility, and AWD capability, offering confident all-season traction that competes directly with rivals like the Mercedes-AMG C63 and Audi RS5 Cabriolet. Critics called it a road test. Drivers called it a love letter. Track-focused performance pedigree Car and Driver 10Best recognition for the M4 platform (series acclaim) Strong enthusiast and media praise for chassis balance and steering precision Frequently highlighted in MotorTrend performance comparisons as a benchmark in its class Positive reviews from major automotive publications for xDrive traction confidence and acceleration Consistently rated highly in luxury sport convertible evaluations by leading automotive reviewers The odometer is hovering around the 14,888-mile mark, and it is STILL COVERED! New Vehicle Limited Warranty (Bumper-to-Bumper): Expires on 11/08/2026 or at 50,000 miles (whichever occurs first). You have 35,112 miles of coverage left. Rust Perforation Limited Warranty: Expires on 11/08/2034 with unlimited mileage. Want to extend its warranty coverage? In most cases, we can provide expanded options to cover each vehicle with a valuable, comprehensive warranty for years to come! This M4 is engineered like a precision instrument, blending BMW M performance heritage with modern luxury technology, reflecting the brand's long-standing ''Ultimate Driving Machine'' ethos in a convertible format. INSTALLED OPTIONS BRING THIS BUILD TO A HIGHLY SPECIFIED PERFORMANCE CONFIGURATION: Executive Package Remote Engine Start -- Enables pre-conditioning of the cabin for comfort Head-Up Display -- Projects key driving data into the driver's field of view Heated Steering Wheel -- Enhances cold-weather driving comfort Driving Assistance Professional Package Active Driving Assistant Pro -- Provides advanced driver assistance support Extended Traffic Jam Assistant -- Supports semi-automated driving in limited highway conditions Parking Assistance Package Parking Assistant Plus -- Assists with automated parking and maneuvering support Exterior & Performance Enhancements 19''/20'' Silver Wheel Set -- Staggered performance wheel configuration for handling stability M Compound Brakes with Black Calipers -- High-performance braking system for repeated track use M Shadowline Lights -- Darkened exterior lighting accents for a performance aesthetic Icon Adaptive LED Headlights with Laserlight -- Enhanced forward illumination performance Interior Luxury & Comfort Enhancements Kyalami Orange/Black Extended Merino Leather Upholstery -- Premium interior material finish Front Ventilated Seats -- Cooling comfort for spirited or warm-weather driving Neck Warmer -- Convertible comfort system for open-top driving Wireless Charging -- Integrated device charging convenience FACTORY STANDARD FEATURES OVERVIEW The 2023 BMW M4 Competition xDrive Convertible features a high-output twin-turbocharged inline-6 engine, performance-tuned xDrive all-wheel drive system, adaptive M suspension, and a reinforced convertible chassis structure engineered for rigidity and dynamic response. MECHANICAL FEATURES This M4 Competition xDrive Convertible is engineered around a high-performance drivetrain paired with BMW's M-tuned all-wheel-drive system, delivering rapid torque distribution and enhanced traction across varying road conditions. The advanced automatic performance transmission enables rapid gear changes optimized for both track and daily driving. Adaptive M suspension technology continuously adjusts damping characteristics to balance ride comfort with aggressive handling dynamics, allowing the vehicle to transition seamlessly from touring comfort to performance-focused driving behavior. EXTERIOR FEATURES The exterior design emphasizes aerodynamic efficiency and aggressive M styling cues, including performance-optimized air intakes, sculpted body lines, and convertible soft-top engineering designed to preserve structural integrity. The staggered 19-inch front and 20-inch rear wheel setup reinforces its performance stance, while adaptive lighting technology enhances nighttime visibility and road presence. The overall design balances luxury refinement with track-inspired detailing. INTERIOR FEATURES Inside, the cabin is crafted with extended Merino leather upholstery and performance-oriented seating geometry designed to support spirited driving. The cockpit integrates driver-focused ergonomics with premium materials and advanced comfort features such as ventilated seating and heated steering. Ambient refinement is paired with M-specific design cues that reinforce its performance identity while maintaining long-distance touring comfort. INFOTAINMENT/MEDIA FEATURES The infotainment system integrates BMW's advanced digital interface with navigation, smartphone connectivity, wireless charging integration, and a head-up display system. Driver information is presented through a high-resolution digital cluster and projected driving data interface. Connected assistance and media functions may include subscription-based services for enhanced navigation and real-time traffic data (may require subscription), supporting a fully modernized in-car experience. SAFETY FEATURES This M4 includes a comprehensive suite of driver assistance technologies such as advanced collision avoidance systems, blind spot monitoring, lane assistance functions, and adaptive driving support through its professional driver assistance package. Parking assistance systems further enhance maneuverability in tight environments, while structural engineering and high-performance braking systems contribute to overall active and passive safety performance. ...and there's SO MUCH more! You can view vehicle files above this description [on our site], which may include the original brochure and window sticker! SAVE THOUSANDS off retail pricing with this 2023 BMW M4! We will happily size up TRADE-IN OFFERS and have EXCELLENT FINANCE OPTIONS as well, so please give us a call at 732-919-0707 (Wall Township) or 856-881-2869 (Sewell) TODAY!

Compra tu carro usado: 2023 BMW M4 Competition xDrive Convertible w/ Driving Assistance Pro. Pkg. por el precio de $68,995

Ven y compra este vehículo usado 2023 BMW M4 Competition xDrive Convertible w/ Driving Assistance Pro. Pkg. en el concesionario Automotive Avenues LLC ubicado en 5011 NJ-33, Wall NJ 07727.

Este carro usado BMW se vende por $68,995.

Este modelo Descapotable de color Tanzanite Blue II Metallic viene con 2 puertas y transmisión 8-Speed Automatic.

Este seminuevo BMW, impulsado por Gasoline, fue registrado por primera vez en 2023 y tiene un kilometraje de 14,888 millas.

Características: Climate Control, Dual Zone Climate Control, Cruise Control, Power Steering, Power Mirrors, Leather Steering Wheel, Rear Air Conditioning, Clock, Tachometer, Telescoping Steering Wheel, Steering Wheel Radio Controls, Driver Airbag, Passenger Airbag, Side Airbags, Security System, Rear Defogger, Intermittent Wipers, AM/FM, Premium Sound System, Merino Leather Interior Surface, Bluetooth, Carpeted Floor Mats, Center Arm Rest, Daytime Running Lights, Heads Up Display, Heated Mirrors, Overhead Console, Parking Sensors, Reverse Camera, Roll Stability Control, Sliding Rear Window, Sport Seats, Tire Pressure Monitor, Vanity Mirrors.

Descubre nuestros otros carros usados BMW M4 y todos nuestros vehículos nuevos en stock a los mejores precios en Wall, Wall, y las áreas circundantes de NJ.



Buy your used car: 2023 BMW M4 Competition xDrive Convertible w/ Driving Assistance Pro. Pkg. for the price of $68,995.


Come and buy this used 2023 BMW M4 Competition xDrive Convertible w/ Driving Assistance Pro. Pkg. vehicle at Automotive Avenues LLC dealership located at 5011 NJ-33, Wall NJ 07727.

This used BMW car is priced at $68,995.

This Descapotable model in Tanzanite Blue II Metallic color comes with 2 doors and 8-Speed Automatic transmission.

This BMW used car, powered by Gasoline, was first registered in 2023 and has a mileage of 14,888 miles.

Features: Climate Control, Dual Zone Climate Control, Cruise Control, Power Steering, Power Mirrors, Leather Steering Wheel, Rear Air Conditioning, Clock, Tachometer, Telescoping Steering Wheel, Steering Wheel Radio Controls, Driver Airbag, Passenger Airbag, Side Airbags, Security System, Rear Defogger, Intermittent Wipers, AM/FM, Premium Sound System, Merino Leather Interior Surface, Bluetooth, Carpeted Floor Mats, Center Arm Rest, Daytime Running Lights, Heads Up Display, Heated Mirrors, Overhead Console, Parking Sensors, Reverse Camera, Roll Stability Control, Sliding Rear Window, Sport Seats, Tire Pressure Monitor, Vanity Mirrors.

Discover our other used BMW M4 cars and all our new vehicles in stock at the best prices in Wall, Wall, and the surrounding areas of NJ.

Descargo de Responsabilidad:

autogozo es una plataforma que proporciona acceso a un inventario conjunto de varios concesionarios en todo Estados Unidos. Si bien nos esforzamos por garantizar la precisión de la información proporcionada en nuestro sitio web, no podemos garantizar la disponibilidad, los precios o el estado de ningún vehículo listado. autogozo actúa como intermediario y no es responsable de inexactitudes, omisiones o errores en los anuncios. Todas las transacciones se realizan directamente con los respectivos concesionarios, y autogozo no será responsable de disputas, representaciones incorrectas o problemas que puedan surgir durante el proceso de compra. Se recomienda verificar minuciosamente los detalles, llevar a cabo una debida diligencia y buscar asesoramiento profesional antes de realizar cualquier compra. Al utilizar nuestra plataforma, usted acepta que autogozo no es responsable de las condiciones de los vehículos, el cumplimiento legal ni de las transacciones realizadas a través de nuestro servicio.

2023 BMW M4 Competition xDrive Convertible w/ Driving Assistance Pro. Pkg. Tanzanite Blue II Metallic Gasoline