2024 BMW M4 Competition xDrive Convertible w/ Executive & Parking Assist Pkg

Wall, NJ
  • Año

    2024

  • Millaje

    17256 mi

  • Combustible

    Gasoline

  • Transmisión

    8-Speed Automatic

SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
SEMINUEVOS BMW M4 a Estados en autogozo thumb
  • Color Exterior

    Toronto Red Metallic

  • Color Interior

    Silverstone/Black

  • Número de Stock

    63595

  • VIN

    WBS33BA01RCP63714

Contactar al concesionario
*Required Fields
Nuestro robot de inteligencia artificial puede seleccionar hasta 5 autos similares para ti y obtener cotizaciones.
  • Premium Sound System
  • AM/FM
  • Aux. Audio Input
  • Bluetooth
  • Carpeted Floor Mats
  • Center Arm Rest
  • Climate Control
  • Clock
  • Cruise Control
  • Daytime Running Lights
  • Driver Airbag
  • Dual Zone Climate Control
  • Heated Mirrors
  • Intermittent Wipers
  • Leather Steering Wheel
  • Merino Leather Interior Surface
  • Navigation System
  • Overhead Console
  • Parking Sensors
  • Passenger Airbag
  • Power Mirrors
  • Power Steering
  • Rear Defogger
  • Reverse Camera
  • Roll Stability Control
  • Security System
  • Side Airbags
  • Sliding Rear Window
  • Sport Seats
  • Steering Wheel Radio Controls
  • Tachometer
  • Telescoping Steering Wheel
  • Tire Pressure Monitor
  • Vanity Mirrors
  • Air Conditioning
  • Marca
  • BMW
  • Modelo
  • M4
  • Versión
  • Competition xDrive Convertible w/ Executive & Parking Assist Pkg
  • Tipo
  • Descapotable
  • Año
  • 2024
  • Número de Stock
  • 63595
  • Color Exterior
  • Toronto Red Metallic
  • Millaje
  • 17256 mi
  • Transmisión
  • 8-Speed Automatic
  • Combustible
  • Gasoline
  • VIN
  • WBS33BA01RCP63714
Comentarios del vehiculo

AGGRESSIVE, EXOTIC, THRILLING, NO-ACCIDENT, ONE-OWNER, NONSMOKER, OUTSTANDING! The 2024 BMW M4 Competition xDrive Convertible with ALL-WHEEL DRIVE represents the open-air pinnacle of BMW's legendary M performance lineup. Combining breathtaking acceleration, razor-sharp handling, grand-touring comfort, and year-round confidence, it delivers a driving experience that few vehicles can match. Its power-folding soft top allows drivers to enjoy the open road at a moment's notice, while BMW's xDrive system helps put immense power to the pavement with remarkable effectiveness. As the Ultimate Driving Machine, this M4 blends supercar-rivaling performance with everyday usability. One of the M4 Competition xDrive Convertible's greatest advantages is its ability to combine serious high-performance capability with genuine four-season versatility. While competitors such as the Porsche 911 Cabriolet, Mercedes-AMG C 63, and Audi RS 5 Cabriolet each offer compelling attributes, few deliver the combination of 523 horsepower, all-wheel-drive traction, rear-biased handling characteristics, everyday comfort, and open-air enjoyment found in this BMW. It is equally capable of dominating a winding back road, effortlessly devouring highway miles, or turning every commute into an event. Many reviewers showed up expecting to evaluate another performance car ... and ended up sounding like they were writing a love letter to BMW's M division. Named to multiple Car and Driver Editors' Choice lists. Frequently ranked among the world's best high-performance luxury coupes and convertibles. Praised by Car and Driver for its astonishing acceleration, grip, and everyday livability. Commended by Edmunds for combining supercar-level performance with daily-driver comfort. Widely recognized as one of the benchmark vehicles in the modern performance-car segment. Consistently praised for its twin-turbocharged powertrain, advanced chassis tuning, and remarkable capability. The odometer is hovering around the 17,256-mile mark, and it is STILL COVERED by the factory. New Vehicle Limited Warranty Coverage expires October 28, 2027 or 50,000 miles. Approximately 32,744 miles of coverage remain. Roadside Assistance Coverage expires October 28, 2027 with unlimited mileage. Corrosion Perforation Warranty Coverage expires October 28, 2035 with unlimited mileage. Want to extend its warranty coverage? In most cases, we can provide expanded options to cover each vehicle with a valuable, comprehensive warranty for years to come! BMW's engineers clearly decided that moderation was overrated. This M4 is packed with performance technology, luxury appointments, advanced driver-assistance systems, and open-air excitement that transform every drive into an occasion. This particular M4 Competition xDrive Convertible goes far beyond standard specification with a collection of carefully selected factory upgrades. Executive Package Remote Engine Start -- Allows the cabin to be preconditioned before driving. BMW Curved Display with Head-Up Display -- Projects key information directly into the driver's field of view. Heated Steering Wheel -- Enhances cold-weather comfort. Parking Assistance Package Parking Assistant Plus -- Adds enhanced parking and maneuvering assistance technologies. Standalone Features Icon Adaptive LED Headlights with Laserlight -- Improves nighttime visibility and lighting performance. Carbon Fiber Interior Trim -- Adds authentic motorsport-inspired cabin detailing. Neck Warmer -- Helps extend top-down driving enjoyment during cooler temperatures. M Shadowline Lights -- Adds distinctive darkened lighting elements. Front Ventilated Seats -- Enhances comfort during warmer weather. Drive Recorder -- Allows recording of driving events and surrounding traffic conditions. Extended Merino Leather Upholstery -- Provides premium luxury throughout the cabin. M Compound Brakes with Black Calipers -- Delivers exceptional stopping performance and fade resistance. The 2024 BMW M4 Competition xDrive Convertible comes standard with a twin-turbocharged inline-six engine, M Sport differential, adaptive M suspension, M-specific xDrive all-wheel drive, variable-ratio steering, power soft top, wireless Apple CarPlay, wireless Android Auto, Harman Kardon audio, navigation, digital instrumentation, dual-zone automatic climate control, heated front seats, and a comprehensive collection of advanced driver-assistance technologies. Performance is unquestionably the centerpiece of the M4 experience. Under the hood resides BMW M's twin-turbocharged 3.0-liter inline-six producing a staggering 523 horsepower and 479 lb-ft of torque. Power is delivered through a lightning-fast eight-speed M Steptronic transmission that provides rapid gear changes while maintaining smoothness during everyday driving. BMW's M xDrive system continuously varies torque distribution to maximize traction while preserving the engaging rear-biased dynamics enthusiasts expect from an M car. Combined with the adaptive suspension, electronically controlled differential, and powerful M Compound Brakes, this convertible accelerates, corners, and stops with astonishing authority. The result is a vehicle capable of sprinting from a standstill to highway speeds with breathtaking urgency while remaining comfortable enough for long-distance touring. The exterior is impossible to ignore. Wide bodywork, aggressive aerodynamic elements, muscular proportions, and the retractable soft-top design create a dramatic presence from every angle. The optional Toronto Red Metallic finish highlights the sculpted body surfaces beautifully, while the M Shadowline lighting treatment adds a sophisticated and performance-focused appearance. Standard 19-inch front and 20-inch rear forged alloy wheels further emphasize the car's purposeful stance and athletic character. Inside, the cabin blends luxury and motorsport influences in equal measure. Extended Merino leather upholstery creates an upscale environment, while the Carbon Fiber interior trim reinforces the vehicle's performance pedigree. The heated steering wheel, ventilated front seats, and Neck Warmer system help make top-down driving enjoyable across a wide range of temperatures. Driver-focused ergonomics place essential controls within easy reach, while premium materials throughout the cabin demonstrate BMW's commitment to craftsmanship. Technology is a major highlight. The BMW Curved Display integrates digital instrumentation and infotainment functions into a sleek, modern interface. Navigation, wireless Apple CarPlay, wireless Android Auto, voice controls, connected services (may require subscription), and the Head-Up Display help keep drivers informed and connected. The available Drive Recorder adds an extra layer of functionality by capturing surrounding traffic situations, while the Harman Kardon premium audio system helps deliver an immersive listening experience. Safety and convenience technologies are equally impressive. Advanced systems include forward-collision mitigation, lane-departure warning, blind-spot monitoring, rear cross-traffic alert, front and rear parking sensors, adaptive lighting technologies, stability control systems, and the enhanced Parking Assistant Plus system. Together, these features help provide confidence whether carving through mountain roads or maneuvering through crowded urban environments. ... and there's SO MUCH more! You can view vehicle files above this description [on our site], which may include the original brochure and window sticker! With the top down and 523 horses under the hood, this M4 doesn't merely make memories ... it makes M-ories. SAVE THOUSANDS off retail pricing with this 2024 BMW M4! We will happily size up TRADE-IN OFFERS and have EXCELLENT FINANCE OPTIONS as well, so please give us a call at 732-919-0707 (Wall Township) or 856-881-2869 (Sewell) TODAY!

Compra tu carro usado: 2024 BMW M4 Competition xDrive Convertible w/ Executive & Parking Assist Pkg por el precio de $70,995

Ven y compra este vehículo usado 2024 BMW M4 Competition xDrive Convertible w/ Executive & Parking Assist Pkg en el concesionario Automotive Avenues LLC ubicado en 5011 NJ-33, Wall NJ 07727.

Este carro usado BMW se vende por $70,995.

Este modelo Descapotable de color Toronto Red Metallic viene con 2 puertas y transmisión 8-Speed Automatic.

Este seminuevo BMW, impulsado por Gasoline, fue registrado por primera vez en 2024 y tiene un kilometraje de 17,256 millas.

Características: Air Conditioning, Climate Control, Dual Zone Climate Control, Cruise Control, Power Steering, Power Mirrors, Leather Steering Wheel, Clock, Tachometer, Telescoping Steering Wheel, Steering Wheel Radio Controls, Driver Airbag, Passenger Airbag, Side Airbags, Security System, Rear Defogger, Intermittent Wipers, AM/FM, Premium Sound System, Merino Leather Interior Surface, Aux. Audio Input, Bluetooth, Carpeted Floor Mats, Center Arm Rest, Daytime Running Lights, Heated Mirrors, Navigation System, Overhead Console, Parking Sensors, Reverse Camera, Roll Stability Control, Sliding Rear Window, Sport Seats, Tire Pressure Monitor, Vanity Mirrors.

Descubre nuestros otros carros usados BMW M4 y todos nuestros vehículos nuevos en stock a los mejores precios en Wall, Wall, y las áreas circundantes de NJ.



Buy your used car: 2024 BMW M4 Competition xDrive Convertible w/ Executive & Parking Assist Pkg for the price of $70,995.


Come and buy this used 2024 BMW M4 Competition xDrive Convertible w/ Executive & Parking Assist Pkg vehicle at Automotive Avenues LLC dealership located at 5011 NJ-33, Wall NJ 07727.

This used BMW car is priced at $70,995.

This Descapotable model in Toronto Red Metallic color comes with 2 doors and 8-Speed Automatic transmission.

This BMW used car, powered by Gasoline, was first registered in 2024 and has a mileage of 17,256 miles.

Features: Air Conditioning, Climate Control, Dual Zone Climate Control, Cruise Control, Power Steering, Power Mirrors, Leather Steering Wheel, Clock, Tachometer, Telescoping Steering Wheel, Steering Wheel Radio Controls, Driver Airbag, Passenger Airbag, Side Airbags, Security System, Rear Defogger, Intermittent Wipers, AM/FM, Premium Sound System, Merino Leather Interior Surface, Aux. Audio Input, Bluetooth, Carpeted Floor Mats, Center Arm Rest, Daytime Running Lights, Heated Mirrors, Navigation System, Overhead Console, Parking Sensors, Reverse Camera, Roll Stability Control, Sliding Rear Window, Sport Seats, Tire Pressure Monitor, Vanity Mirrors.

Discover our other used BMW M4 cars and all our new vehicles in stock at the best prices in Wall, Wall, and the surrounding areas of NJ.

Descargo de Responsabilidad:

autogozo es una plataforma que proporciona acceso a un inventario conjunto de varios concesionarios en todo Estados Unidos. Si bien nos esforzamos por garantizar la precisión de la información proporcionada en nuestro sitio web, no podemos garantizar la disponibilidad, los precios o el estado de ningún vehículo listado. autogozo actúa como intermediario y no es responsable de inexactitudes, omisiones o errores en los anuncios. Todas las transacciones se realizan directamente con los respectivos concesionarios, y autogozo no será responsable de disputas, representaciones incorrectas o problemas que puedan surgir durante el proceso de compra. Se recomienda verificar minuciosamente los detalles, llevar a cabo una debida diligencia y buscar asesoramiento profesional antes de realizar cualquier compra. Al utilizar nuestra plataforma, usted acepta que autogozo no es responsable de las condiciones de los vehículos, el cumplimiento legal ni de las transacciones realizadas a través de nuestro servicio.

2024 BMW M4 Competition xDrive Convertible w/ Executive & Parking Assist Pkg Toronto Red Metallic Gasoline